Multi Level Meter Bridge 2015
ith the new function Peak Detector you can control very accurate the Input of different Levels in a control rooms. In a logfile you are able to comprehend when and what kind of Level is under a threshold. PAS Multi Meter Bridge can be configured in a number of different ways, to accurately model the ballistics, responses and graphics of a wide range of standard peak programme meters. These meters currently include the following:IEC 268-10 Type I (Nordic N9 meter)IEC268-10 Type IIb (EBU PPM meter)IEC 268-10 Type IIa (BBC PPM meter)DIN 45406
You can monitor 8 input channels, 16 input channels or 24 input channels in realtime. Choose between 5ms, 10ms, 15ms, 20ms and 300ms integration time.Referenz Level Level America = -24 dBFS, England / Europe = -18 dBFS and Australia = -20 dBFS